Revenues from Datacenter Construction Market to top US$ 68,953.8 million in 2025

Jan 11, 2018

Orbis research helps to analyze competitive developments such as strategic alliances, mergers ,acquisitions, new products, and research in the Datacenter Construction Market

January 11, 2018 /MarketersMedia/ —

According to a new market research, the Datacenter Construction Market is expected to reach US$ 68,953.8 million by 2022 from US$ 33,871.5 million in 2015.

Ask for Sample Copy of Report @ http://orbisresearch.com/contacts/request-sample/2024956

Electrical design construction segment is expected to continue its dominance. Currently, almost 40% of the datacenter construction market share by revenue is captured by are electrical design. A data center comprises of a hierarchy of electrical devices, which helps in transmitting power from a utility feed to server racks. Some of the important devices include utility feeds, switchgear, generators, UPS, PDUs etc. Electrical supplies arriving at the data center infrastructure need to be transformed to a usable voltage level, which is performed by using transformer. Utility grids are the major source of power supply to the data centers. Whereas, switchgear helps in safely distributing power from the transformer or utility to the datacenter floor. Furthermore, generators and Uninterruptible Power Supply (UPS) deliver temporary and longer-term backup power. Power Distribution Units (PDU) helps in transmitting electricity or power to racks as well as standalone systems.

Key trend which will predominantly effect the market in coming year in datacenter construction market is colocation and cloud services are expected to gain the larger pie of the market. For small enterprises, constructing their own data center involves huge capital. Since, these enterprises don’t have enough budget or capital expenditure to construct a data center also, the ROI is comparatively low. Therefore, most of these enterprises are choosing colocation or cloud services. These companies don’t require much storage space and constructing their own data center is not feasible for them. Thereby, they depend on colocation or CSPs for storing their data. Also, apart from capital required to build a data center, other expenses and efforts such as maintenance and service becomes a burden for these companies. Moreover, the demand for colocation services is giving a rise to construction of mega data centers as it offers economies of scale. Thus, it is anticipated that the colocation and cloud software as service products will increase in the coming years.

The Key Players Mentioned in Keyword Report are:

AECOM Inc
DPR Construction 
Fujitsu Limited
Hitachi Limited
Holder Construction Group, LLC
Rittal GmbH & Co. KG 
Schneider Electric SE
The Whiting-Turner Contracting Company 
Tripp Lite 
Turner Construction Company 

Datacenter construction market by industry vertical is segmented into BFSI, Government, Technology, Telecom Media & Entertainment, Retail, Healthcare and Others. Technology segment by industry use vertical is accounted to hold the lions share in the global data center construction market. Data generated by large social media platforms such as Facebook & twitter, increasing utilization of smartphone applications, and adoption of smart devices are primarily driving the growth of this segment. Speed, size, and efficiency are the essential elements which nowadays rule the IT industry. Increased adoption of smart phones, laptops, tablets, gaming consoles and other gadgets for transferring data has created a need for additional data storage capacity. Data centers offer various benefits to IT industry such as speed of deployment, waste and energy efficiency and most important is scalability. Thus, IT industry is adopting the data centers for keeping pace in the highly competitive market.

Make an Enquiry @ http://orbisresearch.com/contacts/enquiry-before-buying/2024956

The overall market size has been derived using both primary and secondary source. The research process begins with an exhaustive secondary research using internal and external sources to obtain qualitative and quantitative information related to the market. Also, primary interview were conducted with industry participants and commentators in order to validate data and analysis. The participants who typically take part in such a process include industry expert such as VPs, business development managers, market intelligence managers and national sales managers, and external consultant such as valuation experts, research analysts and key opinion leaders specializing in the datacenter construction industry.

Major Points included in this Report  :

1 Table of Contents
List of Tables
List of Figures

2 Introduction
1 Scope of the Study
2 The Insight Partners Research Report Guidance

3 Key Takeaways

4 Data Center Construction Market Landscape

1 Market Overview
2 Market Segmentation
3 PEST Analysis
4 Cost Analysis
5 Data Center Construction Cost Structure

5 Global Data Center Construction Market – Key Industry Dynamics

1 Key Market Drivers
2 Key Market Restraints
3 Key Market Opporunities
4 Future Trends
5 Impact Analysis of Drivers and Restraints
6 Data Center Construction Market – Global

1 Global Data Center Construction Market Overview
2 Global Data Center Construction Market Forecast and Analysis

7 Global Data Center Construction Market Analysis – By Types of Construction

1 Overview
2 Electrical Design
3 Mechanical Design
4 General Construction

8 Global Data Center Construction Market Analysis – By Tier Standards

1 Overview
2 Tier 1 & 2
3 Tier 3
4 Tier 4

9 Global Data Center Construction Market Analysis – By Industry Vertical

1 Overview
2 BFSI
3 Government
4 Technology
5 Telecom Media & Entertainment
6 Retail
7 Healthcare
8 Others

Browse Full Report @ http://orbisresearch.com/reports/index/data-center-construction-market-to-2022-global-analysis-and-forecasts-by-types-of-construction-tier-standards-and-industry-verticals

About Us:

Orbis Research (orbisresearch.com) is a single point aid for all your market research requirements. We have vast database of reports from the leading publishers and authors across the globe. We specialize in delivering customized reports as per the requirements of our clients. We have complete information about our publishers and hence are sure about the accuracy of the industries and verticals of their specialization. This helps our clients to map their needs and we produce the perfect required market research study for our clients.

Contact Information:
Hector Costello
Senior Manager – Client Engagements
4144N Central Expressway,
Suite 600, Dallas,
Texas – 75204, U.S.A.
Phone No.: +1 (214) 884-6817; +9164101019
Email: [email protected]

Contact Info:
Name: Hector Costello
Organization: Orbis Research

Source URL: https://marketersmedia.com/revenues-from-datacenter-construction-market-to-top-us-68953-8-million-in-2025/286275

For more information, please visit http://orbisresearch.com/reports/index/data-center-construction-market-to-2022-global-analysis-and-forecasts-by-types-of-construction-tier-standards-and-industry-verticals

Source: MarketersMedia

Release ID: 286275

More News

YOUR NEWS, OUR NETWORK.

Do you have Great News you want to tell the world?

Be it updates about your business or your community, you can make sure that it’s heard by submitting your story to our network reaching hundreds of news sites across 6 verticals.